<?xml version="1.0" encoding="utf-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "https://jats.nlm.nih.gov/publishing/1.3/JATS-journalpublishing1-3.dtd">
<article article-type="research-article" dtd-version="1.3" xml:lang="en">
  <front xmlns:xlink="http://www.w3.org/1999/xlink">
    <journal-meta>
      <journal-id journal-id-type="elibrary">75504</journal-id>
      <journal-title-group>
        <journal-title>Magazine of Civil Engineering</journal-title>
        <trans-title-group xml:lang="ru">
          <trans-title>Magazine of Civil Engineering</trans-title>
        </trans-title-group>
      </journal-title-group>
      <issn pub-type="epub">2712-8172</issn>
    </journal-meta>
    <article-meta xmlns:xlink="http://www.w3.org/1999/xlink">
      <article-id pub-id-type="publisher-id">11</article-id>
      <article-id pub-id-type="doi">10.5862/MCE.54.11</article-id>
      <title-group>
        <article-title>Soil thrust boring plant of static action with ring spacers of horizontal wells</article-title>
        <trans-title-group xml:lang="ru">
          <trans-title>Грунтопрокалывающая установка статического действия с кольцевыми расширителями горизонтальных скважин</trans-title>
        </trans-title-group>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <name>
            <surname>Penchuk</surname>
            <given-names>Valentin</given-names>
          </name>
          <xref ref-type="aff" rid="aff1"/>
          <email>penshyk@rambler.ru</email>
        </contrib>
        <contrib contrib-type="author">
          <name>
            <surname>Rudnev</surname>
            <given-names>Viacheslav</given-names>
          </name>
          <xref ref-type="aff" rid="aff2"/>
          <email>rudnev_vyacheslav@mail.ua</email>
        </contrib>
        <contrib contrib-type="author">
          <name>
            <surname>Saenko</surname>
            <given-names>Natalie Saenko</given-names>
          </name>
          <xref ref-type="aff" rid="aff2"/>
          <email>sayenkonv@mail.ru</email>
        </contrib>
        <contrib contrib-type="author">
          <name>
            <surname>Suponev</surname>
            <given-names>Vladimir</given-names>
          </name>
          <xref ref-type="aff" rid="aff2"/>
          <email>v-suponev@mail.ru</email>
        </contrib>
        <contrib contrib-type="author">
          <name>
            <surname>Oleksyn</surname>
            <given-names>Vladimir</given-names>
          </name>
          <xref ref-type="aff" rid="aff2"/>
          <email>vladimirumm@ukr.net</email>
        </contrib>
        <contrib contrib-type="author">
          <name>
            <surname>Balesniy</surname>
            <given-names>Sergey</given-names>
          </name>
          <xref ref-type="aff" rid="aff2"/>
          <email>sergey.balesnyy@mail.ru</email>
        </contrib>
        <contrib contrib-type="author">
          <name>
            <surname>Vivchar</surname>
            <given-names>Stanislav</given-names>
          </name>
          <xref ref-type="aff" rid="aff2"/>
          <email>vivchar.stanislav@gmail.com</email>
        </contrib>
      </contrib-group>
      <aff id="aff1">Donbas National Academy of Civil Engineering and Architecture</aff>
      <aff id="aff2">Kharkiv National Automobile and Highway University</aff>
      <pub-date publication-format="electronic" date-type="pub" iso-8601-date="2015-03-27">
        <day>27</day>
        <month>03</month>
        <year>2015</year>
      </pub-date>
      <issue>2</issue>
      <issue-id pub-id-type="publisher-id">54</issue-id>
      <fpage>100</fpage>
      <lpage>107</lpage>
      <self-uri xmlns:xlink="http://www.w3.org/1999/xlink" content-type="pdf" xlink:href="https://engstroy.spbstu.ru/userfiles/files/2015/2(54)/11.pdf"/>
      <abstract xml:lang="en">
        <p>The combined method of horizontal wells development by a soil thrust boring plant of static action with cutting rings has been proposed. The ratio between the diameters of the cutting ring and horizontal well has been determined. The regression equation was received to determine a minimum depth of a horizontal well laying depending on the diameter of the bore hole and soil porosity. The dependencies for determining emerging forces while developing a horizontal well with a cutting ring and its cleaning with a disk with account of geometric parameters of the working equipment and soil condition have been established. The general view of the soil thrust boring plant and its working equipment for developing horizontal wells has been presented.</p>
      </abstract>
      <kwd-group xml:lang="en">
        <kwd>trenchless technologies</kwd>
        <kwd>communication</kwd>
        <kwd>horizontal well</kwd>
        <kwd>thrust boring method</kwd>
        <kwd>jacking</kwd>
        <kwd>combined method</kwd>
        <kwd>soil</kwd>
      </kwd-group>
    </article-meta>
  </front>
</article>
