In recent decades, increasing attention has been directed toward the behavior of unconnected piled raft foundations (UCPRFs) under various soil conditions. In this foundation system, a cushion layer is introduced between the pile heads and the raft, preventing direct structural contact between these components. The cushion provides an intermediate load-transfer medium and facilitates the redistribution of the applied load between the raft and the piles. Understanding this interaction is essential for evaluating the overall response of the foundation and the contribution of its individual components. This study numerically investigated the behavior of UCPRFs using the finite element method implemented in PLAXIS. The analysis considered bearing pressure, foundation settlement, axial stress distribution along the piles, and bending moment response. A parametric investigation was conducted to evaluate the effects of pile length, pile diameter, and raft stiffness on settlement reduction and foundation performance. The results showed that axial stresses in the piles increased with increasing pile length and diameter, demonstrating the influence of pile geometry on load transfer within the foundation system. Furthermore, the maximum axial load occurred at a certain depth below the pile head, indicating that load transfer continued along the upper portion of the pile rather than being concentrated at its head. Within the investigated range, changes in the raft’s modulus of elasticity had no significant effect on settlement reduction. These findings improve the understanding of load-transfer mechanisms in UCPRFs and clarify the relative influence of pile geometry and raft stiffness on their numerical response.

  • Список литературы
    1. Fioravante, V. Load transfer from a raft to a pile with an interposed layer. Géotechnique. 2011. 61(2). Pp. 121–132.
    2. Cao, X.D., Wong, I.H., Chang, M.F. Behavior of model rafts resting on pile-reinforced sand. Journal of Geotechnical and Geoenvironmental Engineering. 2004. 130(2). Pp. 129–138.
    3. Ko, K.W., Park, H.J., Ha, J.G., Jin, S., Song, Y.H., Song, M.J., Kim, D.S. Evaluation of dynamic bending moment of disconnected piled raft via centrifuge tests. Canadian Geotechnical Journal. 2019. 56(12). Pp. 1917–1928.
    4. Karkush, M., Nafel, S. Numerical modeling of connected and disconnected piled raft foundation under seismic loading in clayey soil. Magazine of Civil Engineering. 2025. 18(4). 13610. DOI: 10.34910/MCE.136.10
    5. Ali, A.M., Karkush, M.O., Al-Jorany, A.N. Numerical modeling of connected piled raft foundation under seismic loading in layered soils. Journal of the Mechanical Behavior of Materials. 2023. 32(1). 20220250. DOI: 10.1515/jmbm-2022-0250
    6. Rasouli, H., Azizkandi, A.S., Baziar, M.H., Modarresi, M., Shahnazari, H. Centrifuge modeling of non-connected piled raft system. International Journal of Civil Engineering. 2015. 13(2). Pp. 114–123.
    7. Baziar, M.H., Ghorbani, A., Katzenbach, R. Small-scale model test and three-dimensional analysis of pile-raft foundation on medium-dense sand. International Journal of Civil Engineering. 2009. 7(3). Pp. 170–175.
    8. Chen, R.P., Xu, Z.Z., Chen, Y.M., Ling, D.S., Zhu, B. Field tests on pile-supported embankments over soft ground. Journal of Geotechnical and Geoenvironmental Engineering. 2010. 136(6). Pp. 777–785.
    9. Ghalesari, A.T., Rasouli, H. Effect of gravel layer on the behavior of piled raft foundations. Advances in Soil Dynamics and Foundation Engineering. 2014. Pp. 373–382.
    10. AlSaadi, K.A., Almurshedi, A.D., Karkush, M. Effect of geosynthetics-reinforced cushion on the behavior of partial connected piled raft foundation in dry and saturated sandy soil using shaking table. Indian Geotechnical Journal. 2025. 55(1). Pp. 19-32. DOI: 10.1007/s40098-024-00890-0
    11. Jihad, A., Karkush, M. Behavior of geosynthetics-strengthened saturated cushion layer in disconnected piled-raft system under seismic loading. Indian Geotechnical Journal. 2024. 54(6). Pp. 2062-2075. DOI: 10.1007/s40098-024-00877-x
    12. Liang, F.Y., Chen, L.Z., Shi, X.G. Numerical analysis of composite piled raft with cushion subjected to vertical load. Computers and Geotechnics. 2003. 30(6). Pp. 443–453.
    13. Karkush, M., Almurshedi, A.D., AlSaadi, K.A., Al-Salakh, A.M.S. Behavior of partially connected piled raft foundation under seismic loading. Magazine of Civil Engineering. 2024. 2024. 17(4). 12801. DOI: 10.34910/MCE.128.1
    14. Tradigo, F., Pisanò, F., Di Prisco, C., Mussi, A. Non-linear soil–structure interaction in disconnected piled raft foundations. Computers and Geotechnics. 2015. 63. Pp. 121–134. DOI: 10.1016/j.compgeo.2014.08.014
    15. Khalil, AI., Mahmood, M.R., Baker, H.H. Improvement separation layer of disconnected piled raft foundations using geogrid and geocell layers. E3S Web of Conferences 2021. 318. 01017. DOI: 10.1051/e3sconf/202131801017
    16. Wong, I.H., Chang, M.F., Cao, X.D. Settlement-reducing piles. Design Applications of Raft Foundations. 2000. 469.
    17. Magnan, J.P. Methods to reduce the settlement of embankments on soft clay: a review. Proceedings of the Specialty Conference on the Foundations and Embankments Deformations, ASCE Geotechnical Special Publication. 1994. 40. Pp. 77–90.
    18. Karkush, M.O., Aljorany, A.N. Analytical and Numerical Analysis of Piled-Raft Foundation of Storage Tank. Construction in Geotechnical Engineering. Lecture Notes in Civil Engineering. Springer, Singapore, 2020. 84. DOI: 10.1007/978-981-15-6090-3_26
    19. Kaavya, D., Divya Krishnan, K., Ravichandran, P.T. Study of piled and disconnected piled raft system with raft foundation in cohesionless soil. IOP Conference Series: Materials Science and Engineering. 2020. 912(6).  062061).
    20. PLAXIS Materials Models Version 8 Manual, 2020.
    21. Fleming, K., Weltman, A., Randolph, M., Elson, K. Piling engineering. CRC press; 2008.
    22. Melese, F.W., Gebregziabher, H.F. Behavior of structurally non-connected settlement reducing piles under raft foundation. Journal of Civil and Environmental Engineering. 2021. 11(428.1513). 35318.‏
    23. Senoon, A.A., Hussein, M.M., Kenawi, M.A., Aref, A. Studying the effect of cushion properties on the behavior of unconnected piled raft foundation. Life Science Journal. 2020. 17(10). Pp. 40–47. DOI: 10.7537/marslsj171020.04
    24. Ata, A., Badrawi, E., Nabil, M. Numerical analysis of unconnected piled raft with cushion. Ain Shams Engineering Journal. 2015. 6(2). Pp. 421–428. DOI: 10.1016/J.ASEJ.2014.11.002
    25. Zhu, X.J., Fei, K., Wang, S.W. Horizontal loading tests on disconnected piled rafts and a simplified method to evaluate the horizontal bearing capacity. Advances in Civil Engineering. 2018. 2018(1). 3956509.
    26. Horikoshi, K., Randolph, M.F. On the definition of raft—soil stiffness ratio for rectangular rafts. Géotechnique. 1997. 47(5). 1055–1561.