Automated organization production and mounting of glass curtain walls

Technology and organization of construction
Authors:
Abstract:

At present the automation of organizational design and organizational preparation of building production is based mainly on the outdated methods. Solution of this requires the development of effective methods of technical regulation and construction scheduling. Authors use methods of technical regulation and scheduling, previously obtained in structuralfunctional modeling theory, for production and mounting of glass curtain walls. The article shows the application of these standards in determining the time of producing series of glass facade elements for particular building sites, as well as in the synchronized scheduling production and mounting of these structures. Authors claim that suggested methods can be used for organizational design and organizational preparation of any other construction processes. Received data can be used to create databases of organization standards of labor and time inputs for production.