Latest issues
- 2026,Volume 19Issue 1
- 2025,Volume 18Issue 8 Full text
- 2025,Volume 18Issue 7 Full text
- 2025,Volume 18Issue 6 Full text
Articles from section "Technology and organization of construction"
Dust atlas of construction works in point-pattern housing development
- Year: 2026
- Volume: 19
- Issue: 1
- 9
- 76
- Pages: 14108-14108
Method for developing a corporate BIM classification system
- Year: 2025
- Volume: 18
- Issue: 4
- 86
- 1449
- Pages: 13609-13609
Integration of digital twin and BIM technologies within factories of the future
- Year: 2021
- Issue: 1
- 557
- 8007
- Pages: 10114-10114
Business plan for an investment and construction project based on economic and mathematical models
- Year: 2009
- Issue: 3
- 29
- 4170
- Pages: 61-64
Complex use of monolithic foam concrete for construction in hard-to-rich areas of energy resources production
- Year: 2009
- Issue: 4
- 23
- 4218
- Pages: 16-20
Particular qualities of the container yards design and construction in winter
- Year: 2009
- Issue: 6
- 36
- 4396
- Pages: 44-46
The quality of the design project documentation in terms of technical expertise in Lithuania
- Year: 2010
- Issue: 2
- 10
- 4242
- Pages: 4-11
Automatized development of design estimates using estimate bases 2001
- Year: 2010
- Issue: 3
- 18
- 3958
- Pages: 19-22
The main directions of building processes reliability improving
- Year: 2010
- Issue: 4
- 36
- 4087
- Pages: 59-60
Designing of steel frameworks from thin-walled cold-formed profiles in SCAD Office
- Year: 2010
- Issue: 8
- 40
- 5066
- Pages: 38-46
GOST R 53778-2010: the engineering services survey and other pecularities of new normative document
- Year: 2011
- Issue: 1
- 17
- 4131
- Pages: 5-7
Risk management in implementation of investment building project on the example of business center construction
- Year: 2011
- Issue: 2
- 31
- 4412
- Pages: 48-51
Organizational and technological factors influence on the efficiency of building management
- Year: 2011
- Issue: 2
- 61
- 4484
- Pages: 52-54
Working operations of simple technological processes in construction industry ordering
- Year: 2011
- Issue: 7
- 25
- 4660
- Pages: 87-99
Building side area minimization at the expense of optimization the schedule of movement of workers
- Year: 2011
- Issue: 7
- 23
- 4437
- Pages: 76-81
On the basic principles of quality assurance of construction. International experience
- Year: 2009
- Issue: 1
- 20
- 3966
- Pages: 55-56
Generalized criteria for the optimal choice of technologies and machines
- Year: 2009
- Issue: 1
- 10
- 3787
- Pages: 32-39
The economic effect of increasing the level of NPP construction project development and implementation
- Year: 2008
- Issue: 2
- 9
- 3784
- Pages: 54-56
Modern ways of dealing with noise in buildings and residential areas
- Year: 2008
- Issue: 2
- 18
- 3892
- Pages: 45-49
Rational construction method for linearly extended structures based on alterative options
- Year: 2012
- Issue: 7
- 12
- 4271
- Pages: 89-92
The organizational and technological reliability improvement in construction by using failure prediction method
- Year: 2013
- Issue: 3
- 29
- 4858
- Pages: 43-50
Automated organization production and mounting of glass curtain walls
- Year: 2013
- Issue: 7
- 23
- 4971
- Pages: 58-66
The model of the space-time analogy in the optimization of the renovation order of buildings
- Year: 2013
- Issue: 7
- 21
- 4576
- Pages: 51-57
Universal method for calculation of reliable completion times
- Year: 2016
- Issue: 7
- 31
- 4777
- Pages: 70-80
Adaptability to manufacture varieties of modern disassembled formwork systems
- Year: 2014
- Issue: 7
- 25
- 4723
- Pages: 80-88
Economic evaluation of calendar plans for the construction of nuclear power plants
- Year: 2008
- Issue: 1
- 6
- 3666
- Pages: 51-52
The main aspects of the value-oriented management of investment and construction housing projects
- Year: 2015
- Issue: 7
- 52
- 4783
- Pages: 18-29
Сonstruction management in terms of indicator of the successfully fulfilled production task
- Year: 2016
- Issue: 3
- 59
- 4855
- Pages: 77-91
Development of Methodology for Time Management of Construction Projects
- Year: 2016
- Issue: 2
- 118
- 5244
- Pages: 102-112
Modeling a set of concrete strength in the program ELCUT at warming of monolithic structures by wire
- Year: 2015
- Issue: 2
- 43
- 6131
- Pages: 33-45
The method of calculation for the period of checking utility systems
- Year: 2017
- Issue: 2
- 32
- 5012
- Pages: 72-83
Program Evaluation and Review Technique as the tool for time control
- Year: 2017
- Issue: 4
- 95
- 5330
- Pages: 12-19
Selection criteria of space planning and structural solutions of low-rise buildings
- Year: 2017
- Issue: 7
- 62
- 5237
- Pages: 84-93
Technical normalization of working processes in construction based on spatial-temporal modeling
- Year: 2017
- Issue: 8
- 59
- 4809
- Pages: 84-97
Organizational and technological reliability of the construction process
- Year: 2018
- Issue: 1
- 120
- 6164
- Pages: 59-67
Adaptive finite-element models in structural health monitoring systems
- Year: 2018
- Issue: 2
- 82
- 5313
- Pages: 169-178
Refined methods for calculating and designing engineering structures
- Year: 2018
- Issue: 2
- 33
- 4681
- Pages: 101-115
Seismic design optimization considering base-isolation system
- Year: 2018
- Issue: 4
- 57
- 5191
- Pages: 138-150
Min-cut algorithm for network schedule by merging the vertices
- Year: 2018
- Issue: 4
- 17
- 4690
- Pages: 37-47
Reliability assessment of the construction schedule by the critical chain method
- Year: 2018
- Issue: 5
- 184
- 6069
- Pages: 25-31

