Latest issues
- 2026,Volume 19Issue 4
- 2026,Volume 19Issue 3 Full text
- 2026,Volume 19Issue 2 Full text
- 2026,Volume 19Issue 1 Full text
Articles from section "Water supply, sewerage, construction systems of water resources protection"
Optimization of the pipeline diameter of the water supply system
- Year: 2026
- Volume: 19
- Issue: 4
- 16
- 352
- Pages: 14404-14404
Physical and mathematical model of a settling tank with thin-layer modules
- Year: 2025
- Volume: 18
- Issue: 6
- 84
- 1900
- Pages: 13807-13807
Neural network modeling for real-time water quality assessment
- Year: 2025
- Volume: 18
- Issue: 6
- 94
- 1874
- Pages: 13806-13806
Detection of unauthorized connections to storm drains based on passive radio frequency identification technology
- Year: 2025
- Volume: 18
- Issue: 2
- 141
- 5145
- Pages: 13404-13404
Improving the efficiency of cleaning metal pipes of the sewerage system of the city of Yerevan
- Year: 2024
- Volume: 17
- Issue: 7
- 45
- 3492
- Pages: 13106-13106
Filtration calculation to reduce the construction impact on hydrogeological conditions in the city
- Year: 2024
- Volume: 17
- Issue: 6
- 155
- 4022
- Pages: 13007-13007
Numerical study of the process of unsteady flow in a three-layer porous medium
- Year: 2023
- Issue: 3
- 85
- 4905
- Pages: 11902-11902
Removal of heavy metals from wastewater with natural and modified sorbents
- Year: 2022
- Issue: 3
- 82
- 5152
- Pages: 11110-11110
Regularities of rapid filter backwash water clarification in reagent-free mode
- Year: 2022
- Issue: 3
- 56
- 5509
- Pages: 11107-11107
Centrifugal modeling of underground polymer pipes under temperature effect
- Year: 2020
- Issue: 6
- 118
- 5862
- Pages: 9801-9801
Nonlinear vibrations of fluid transporting pipelines on a viscoelastic foundation
- Year: 2019
- Issue: 2
- 124
- 5884
- Pages: 30-45
Main inorganic ions and electric conductivity of polluted urban streams
- Year: 2016
- Issue: 8
- 54
- 6463
- Pages: 37-44

