Latest issues
- 2025, Volume 18 Issue 5
- 2025, Volume 18 Issue 4
- 2025, Volume 18 Issue 3
- 2025, Volume 18 Issue 2 Full text
Tamara Soldatenko
Affiliation
Peter the Great St. Petersburg Polytechnic University
Publications
РИНЦ ID
8283-4917
The organizational and technological reliability improvement in construction by using failure prediction method
- Year: 2013
- Issue: 3
- 29
- 4014
- Pages: 43-50
Model of work management in the operating organization for the maintenance of building systems
- Year: 2013
- Issue: 2
- 10
- 3647
- Pages: 89-103
Model of the residual resource of plumbing systems with high level of wear
- Year: 2012
- Issue: 6
- 14
- 3536
- Pages: 64-72
The model of intellectual support of decision-making in building structures condition management
- Year: 2012
- Issue: 3
- 10
- 3889
- Pages: 74-82
Model of identification and prediction of building design defects on the basis of its inspection results
- Year: 2011
- Issue: 7
- 27
- 3620
- Pages: 52-61
The method of calculation for the period of checking utility systems
- Year: 2017
- Issue: 2
- 32
- 4127
- Pages: 72-83