Articles by keywords "control"
Detection of unauthorized connections to storm drains based on passive radio frequency identification technology
- Year: 2025
- Volume: 18
- Issue: 2
- 131
- 3196
- Pages: 13404-13404
Tuned mass damper for reduction seismic and wind loads
- Year: 2024
- Volume: 17
- Issue: 5
- 76
- 2613
- Pages: 12904-12904
Thermal stresses at the early stage of the hardening of steel-fiber reinforced concrete
- Year: 2022
- Issue: 5
- 61
- 4146
- Pages: 11304-11304
Tendencies in developing structural designs of non-soil seepage-control structures of embankment dams
- Year: 2021
- Issue: 2
- 104
- 4063
- Pages: 10212-10212
The effect of design on interaction of foundation slabs with the base
- Year: 2019
- Issue: 5
- 172
- 5304
- Pages: 141-155
Use features of resistive electrocontact method for control of steel structures deflected mode
- Year: 2010
- Issue: 3
- 29
- 3962
- Pages: 32-34
About the development of self-regulated organization standards for evaluation of quality control system in construction
- Year: 2010
- Issue: 3
- 9
- 3671
- Pages: 24-26
Bottom paving as a part of the low pressure culvert erected by the float-on method
- Year: 2012
- Issue: 9
- 15
- 4179
- Pages: 97-102
The influence of control algorithm on the annual energy consumption of automated climate systems
- Year: 2012
- Issue: 2
- 10
- 3712
- Pages: 48-50
Improving the engineering systems reliability by formalizing the failure search
- Year: 2012
- Issue: 2
- 16
- 3488
- Pages: 39-47
Estimating reliability of buildings and structures according to the methods of the risk of unserviceability
- Year: 2012
- Issue: 7
- 29
- 4519
- Pages: 76-88
Research of adjustable parameters in the automated climatic systems at the aim of energy saving
- Year: 2013
- Issue: 2
- 14
- 3666
- Pages: 13-18
Characteristics of the magnetic control of separable ferrous impurities contained in raw construction materials
- Year: 2013
- Issue: 3
- 9
- 4350
- Pages: 24-28
Settlement and experimental control of energy saving for buildings
- Year: 2013
- Issue: 8
- 13
- 4224
- Pages: 24-30
Development of Methodology for Time Management of Construction Projects
- Year: 2016
- Issue: 2
- 115
- 4481
- Pages: 102-112
Тhe method of calculating the accuracy of large-span metal rod systems
- Year: 2016
- Issue: 1
- 23
- 4833
- Pages: 60-73
The method of calculation for the period of checking utility systems
- Year: 2017
- Issue: 2
- 32
- 4305
- Pages: 72-83
Program Evaluation and Review Technique as the tool for time control
- Year: 2017
- Issue: 4
- 91
- 4557
- Pages: 12-19
The simulation models of river flow management by a system of flood control facilities
- Year: 2017
- Issue: 8
- 45
- 4428
- Pages: 40-49
Reliability assessment of the construction schedule by the critical chain method
- Year: 2018
- Issue: 5
- 178
- 5206
- Pages: 25-31