Articles by keywords "control"
Monitoring and reliability assessment of a caisson gate frame in operational conditions
- Year: 2026
- Volume: 19
- Issue: 2
- 27
- 974
- Pages: 14210-14210
Structural behavior of ultra-high performance concrete beams with different rebar and fiber reinforcement ratios
- Year: 2025
- Volume: 18
- Issue: 7
- 58
- 1654
- Pages: 13908-13908
Detection of unauthorized connections to storm drains based on passive radio frequency identification technology
- Year: 2025
- Volume: 18
- Issue: 2
- 141
- 5303
- Pages: 13404-13404
Tuned mass damper for reduction seismic and wind loads
- Year: 2024
- Volume: 17
- Issue: 5
- 93
- 4611
- Pages: 12904-12904
Thermal stresses at the early stage of the hardening of steel-fiber reinforced concrete
- Year: 2022
- Issue: 5
- 64
- 5889
- Pages: 11304-11304
Tendencies in developing structural designs of non-soil seepage-control structures of embankment dams
- Year: 2021
- Issue: 2
- 106
- 5639
- Pages: 10212-10212
The effect of design on interaction of foundation slabs with the base
- Year: 2019
- Issue: 5
- 175
- 6810
- Pages: 141-155
Use features of resistive electrocontact method for control of steel structures deflected mode
- Year: 2010
- Issue: 3
- 29
- 5399
- Pages: 32-34
Bottom paving as a part of the low pressure culvert erected by the float-on method
- Year: 2012
- Issue: 9
- 21
- 5551
- Pages: 97-102
The influence of control algorithm on the annual energy consumption of automated climate systems
- Year: 2012
- Issue: 2
- 11
- 5069
- Pages: 48-50
Improving the engineering systems reliability by formalizing the failure search
- Year: 2012
- Issue: 2
- 16
- 4864
- Pages: 39-47
Research of adjustable parameters in the automated climatic systems at the aim of energy saving
- Year: 2013
- Issue: 2
- 15
- 5087
- Pages: 13-18
Characteristics of the magnetic control of separable ferrous impurities contained in raw construction materials
- Year: 2013
- Issue: 3
- 9
- 5763
- Pages: 24-28
Settlement and experimental control of energy saving for buildings
- Year: 2013
- Issue: 8
- 15
- 5631
- Pages: 24-30
Development of Methodology for Time Management of Construction Projects
- Year: 2016
- Issue: 2
- 122
- 6041
- Pages: 102-112
Тhe method of calculating the accuracy of large-span metal rod systems
- Year: 2016
- Issue: 1
- 23
- 6287
- Pages: 60-73
The method of calculation for the period of checking utility systems
- Year: 2017
- Issue: 2
- 34
- 5696
- Pages: 72-83
Program Evaluation and Review Technique as the tool for time control
- Year: 2017
- Issue: 4
- 99
- 6061
- Pages: 12-19
The simulation models of river flow management by a system of flood control facilities
- Year: 2017
- Issue: 8
- 48
- 6095
- Pages: 40-49
Reliability assessment of the construction schedule by the critical chain method
- Year: 2018
- Issue: 5
- 186
- 6924
- Pages: 25-31

