Articles by keywords "control"
Detection of unauthorized connections to storm drains based on passive radio frequency identification technology
- Year: 2025
- Volume: 18
- Issue: 2
- 79
- 428
- Pages: 13404-13404
Tuned mass damper for reduction seismic and wind loads
- Year: 2024
- Volume: 17
- Issue: 5
- 67
- 1126
- Pages: 12904-12904
Thermal stresses at the early stage of the hardening of steel-fiber reinforced concrete
- Year: 2022
- Issue: 5
- 60
- 2292
- Pages: 11304-11304
Tendencies in developing structural designs of non-soil seepage-control structures of embankment dams
- Year: 2021
- Issue: 2
- 103
- 2998
- Pages: 10212-10212
The effect of design on interaction of foundation slabs with the base
- Year: 2019
- Issue: 5
- 172
- 4191
- Pages: 141-155
Use features of resistive electrocontact method for control of steel structures deflected mode
- Year: 2010
- Issue: 3
- 28
- 2836
- Pages: 32-34
About the development of self-regulated organization standards for evaluation of quality control system in construction
- Year: 2010
- Issue: 3
- 9
- 2743
- Pages: 24-26
Bottom paving as a part of the low pressure culvert erected by the float-on method
- Year: 2012
- Issue: 9
- 14
- 3115
- Pages: 97-102
The influence of control algorithm on the annual energy consumption of automated climate systems
- Year: 2012
- Issue: 2
- 9
- 2758
- Pages: 48-50
Improving the engineering systems reliability by formalizing the failure search
- Year: 2012
- Issue: 2
- 15
- 2638
- Pages: 39-47
Estimating reliability of buildings and structures according to the methods of the risk of unserviceability
- Year: 2012
- Issue: 7
- 28
- 3324
- Pages: 76-88
Research of adjustable parameters in the automated climatic systems at the aim of energy saving
- Year: 2013
- Issue: 2
- 12
- 2724
- Pages: 13-18
Characteristics of the magnetic control of separable ferrous impurities contained in raw construction materials
- Year: 2013
- Issue: 3
- 9
- 3140
- Pages: 24-28
Settlement and experimental control of energy saving for buildings
- Year: 2013
- Issue: 8
- 12
- 3254
- Pages: 24-30
Development of Methodology for Time Management of Construction Projects
- Year: 2016
- Issue: 2
- 112
- 3496
- Pages: 102-112
Тhe method of calculating the accuracy of large-span metal rod systems
- Year: 2016
- Issue: 1
- 23
- 3659
- Pages: 60-73
The method of calculation for the period of checking utility systems
- Year: 2017
- Issue: 2
- 31
- 3321
- Pages: 72-83
Program Evaluation and Review Technique as the tool for time control
- Year: 2017
- Issue: 4
- 88
- 3368
- Pages: 12-19
The simulation models of river flow management by a system of flood control facilities
- Year: 2017
- Issue: 8
- 42
- 3331
- Pages: 40-49
Reliability assessment of the construction schedule by the critical chain method
- Year: 2018
- Issue: 5
- 171
- 4078
- Pages: 25-31