Articles from section "Technology and organization of construction"
Integration of digital twin and BIM technologies within factories of the future
- Year: 2021
- Issue: 1
- 473
- 4251
- Pages: 10114-10114
Business plan for an investment and construction project based on economic and mathematical models
- Year: 2009
- Issue: 3
- 22
- 2085
- Pages: 61-64
Complex use of monolithic foam concrete for construction in hard-to-rich areas of energy resources production
- Year: 2009
- Issue: 4
- 15
- 2084
- Pages: 16-20
Particular qualities of the container yards design and construction in winter
- Year: 2009
- Issue: 6
- 27
- 2085
- Pages: 44-46
The quality of the design project documentation in terms of technical expertise in Lithuania
- Year: 2010
- Issue: 2
- 8
- 2069
- Pages: 4-11
Automatized development of design estimates using estimate bases 2001
- Year: 2010
- Issue: 3
- 16
- 1885
- Pages: 19-22
About the development of self-regulated organization standards for evaluation of quality control system in construction
- Year: 2010
- Issue: 3
- 9
- 2058
- Pages: 24-26
The main directions of building processes reliability improving
- Year: 2010
- Issue: 4
- 28
- 1949
- Pages: 59-60
Designing of steel frameworks from thin-walled cold-formed profiles in SCAD Office
- Year: 2010
- Issue: 8
- 34
- 2434
- Pages: 38-46
GOST R 53778-2010: the engineering services survey and other pecularities of new normative document
- Year: 2011
- Issue: 1
- 13
- 1947
- Pages: 5-7
Risk management in implementation of investment building project on the example of business center construction
- Year: 2011
- Issue: 2
- 23
- 2091
- Pages: 48-51
Organizational and technological factors influence on the efficiency of building management
- Year: 2011
- Issue: 2
- 52
- 2233
- Pages: 52-54
Working operations of simple technological processes in construction industry ordering
- Year: 2011
- Issue: 7
- 20
- 2186
- Pages: 87-99
Building side area minimization at the expense of optimization the schedule of movement of workers
- Year: 2011
- Issue: 7
- 21
- 2104
- Pages: 76-81
On the basic principles of quality assurance of construction. International experience
- Year: 2009
- Issue: 1
- 16
- 1933
- Pages: 55-56
Generalized criteria for the optimal choice of technologies and machines
- Year: 2009
- Issue: 1
- 8
- 1853
- Pages: 32-39
The economic effect of increasing the level of NPP construction project development and implementation
- Year: 2008
- Issue: 2
- 4
- 1748
- Pages: 54-56
Modern ways of dealing with noise in buildings and residential areas
- Year: 2008
- Issue: 2
- 11
- 1838
- Pages: 45-49
Rational construction method for linearly extended structures based on alterative options
- Year: 2012
- Issue: 7
- 12
- 1928
- Pages: 89-92
The organizational and technological reliability improvement in construction by using failure prediction method
- Year: 2013
- Issue: 3
- 27
- 2369
- Pages: 43-50
Automated organization production and mounting of glass curtain walls
- Year: 2013
- Issue: 7
- 22
- 2485
- Pages: 58-66
The model of the space-time analogy in the optimization of the renovation order of buildings
- Year: 2013
- Issue: 7
- 19
- 2350
- Pages: 51-57
Universal method for calculation of reliable completion times
- Year: 2016
- Issue: 7
- 24
- 2305
- Pages: 70-80
The capacity limitations of power transmission cable lines in the structure of civil and industry engineering networks
- Year: 2014
- Issue: 6
- 23
- 2416
- Pages: 75-83
Adaptability to manufacture varieties of modern disassembled formwork systems
- Year: 2014
- Issue: 7
- 21
- 2278
- Pages: 80-88
Economic evaluation of calendar plans for the construction of nuclear power plants
- Year: 2008
- Issue: 1
- 4
- 1691
- Pages: 51-52
The main aspects of the value-oriented management of investment and construction housing projects
- Year: 2015
- Issue: 7
- 43
- 2258
- Pages: 18-29
Сonstruction management in terms of indicator of the successfully fulfilled production task
- Year: 2016
- Issue: 3
- 56
- 2559
- Pages: 77-91
Development of Methodology for Time Management of Construction Projects
- Year: 2016
- Issue: 2
- 101
- 2678
- Pages: 102-112
Modeling a set of concrete strength in the program ELCUT at warming of monolithic structures by wire
- Year: 2015
- Issue: 2
- 34
- 3182
- Pages: 33-45
The method of calculation for the period of checking utility systems
- Year: 2017
- Issue: 2
- 31
- 2543
- Pages: 72-83
Program Evaluation and Review Technique as the tool for time control
- Year: 2017
- Issue: 4
- 72
- 2424
- Pages: 12-19
Selection criteria of space planning and structural solutions of low-rise buildings
- Year: 2017
- Issue: 7
- 54
- 2453
- Pages: 84-93
Technical normalization of working processes in construction based on spatial-temporal modeling
- Year: 2017
- Issue: 8
- 49
- 2313
- Pages: 84-97
Organizational and technological reliability of the construction process
- Year: 2018
- Issue: 1
- 99
- 3274
- Pages: 59-67
Adaptive finite-element models in structural health monitoring systems
- Year: 2018
- Issue: 2
- 63
- 2507
- Pages: 169-178
Refined methods for calculating and designing engineering structures
- Year: 2018
- Issue: 2
- 28
- 2145
- Pages: 101-115
Seismic design optimization considering base-isolation system
- Year: 2018
- Issue: 4
- 44
- 2446
- Pages: 138-150
Min-cut algorithm for network schedule by merging the vertices
- Year: 2018
- Issue: 4
- 15
- 2134
- Pages: 37-47
Reliability assessment of the construction schedule by the critical chain method
- Year: 2018
- Issue: 5
- 160
- 3023
- Pages: 25-31
Site-selection on the basis of territorial analysis methods
- Year: 2018
- Issue: 5
- 36
- 2255
- Pages: 15-24